ZERO NET ENERGY BUILDING AWARD Supporting Data Reporting Form "This form is intended to assist entrants in organizing their electricity production and use data that is read from both the on-site generation meter and from the on-site electric utility company meter. This reporting form assumes that the electric utility company meter is a dual-channel ""net meter"". If your utility meter does not provide this information, then contact the NESEA office for an alternative reporting format. It is also expected that the post inverter meter on the on-site generation equipment is a ""revenue grade"" meter — please confirm that this is so in the cell below. Data is to be entered in the cells that are GRAY below." Project Camden Friends Meeting Social Hall Owner Camden Friends Confirmation: unsure "The post inverter meter on the on-site generation equipment is a ""revenue grade"" meter" PRODUCED IMPORTED EXPORTED Month Number of Days from previous meter reading Post inverter meter (ENTER READING) kWh / mo. generated Imported kwh (from Utility Meter) ENTER READING Imported kwh /mo. Exported kwh (from Utility Meter) ENTER READING Exported kwh / mo. Generated and consumed onsite Total Consumed Net Consumed Net Consumed (double check) May 1783 1783 0 0 1783 1783 0 0 June 1728 -55 40 0 0 -55 -55 0 0 July 1712 -16 0 680 680 -696 -696 -680 -680 Aug 1629 -83 520 520 -680 597 1117 1200 1200 Sep 1560 -69 -520 320 320 -389 -909 -840 -840 Oct 1484 -76 0 240 -80 4 4 80 80 Nov 1172 -312 0 -240 -72 -72 240 240 Dec 1122 -50 2200 2200 0 -50 2150 2200 2200 Jan 1198 76 -2200 0 76 -2124 -2200 -2200 Feb 1263 65 2560 2560 0 65 2625 2560 2560 March 1687 424 1200 -1360 0 424 -936 -1360 -1360 April 1648 -39 -1200 360 360 -399 -1599 -1560 -1560 May 1783 135 0 200 -160 295 295 160 160 -1783 0 -200 -1583 -1583 200 200 0 0 0 0 0 0 0 0 0 0 0 0 0 0