Transformations---15 Laurel Street, Northampton, MA
Project Photo Gallery
Project Team
Other Team Members
Transformations, Inc. was the Builder and the Solar Installer.
15 Laurel Street, Northampton is the first Transformations, Inc. home to be completed under the Massachusetts Department of Energy Pathway to Zero grant program. This HERS -9 home was completed on June 17, 2015.
Quick Facts
General
Location
Northampton, Massachusetts
Building Type
Singe family residence
Project Type
Zero Energy
Basis of Performance Claim
Modeled
Bedrooms
4
Bathrooms
2.5
Conditioned Floor Area
2,234 sq ft
Total Cost of Project
$407,900
Energy Summary
Energy Data Type
Modeled
Renewable Energy System Type(s)
Ratings
HERS Index
-9
Envelope and Mechanicals
Subslab assembly
2" of rigid under the basement slab.
Foundation wall assembly
3.5" of high density foam.
Above grade wall assembly
12" of double studded wall mostly filled with medium density foam.
Air Changes per hour, ACH50
1.00 ACH50
Project Photo Gallery
Project Team
Other Team Members
Transformations, Inc. was the Builder and the Solar Installer.
15 Laurel Street, Northampton is the first Transformations, Inc. home to be completed under the Massachusetts Department of Energy Pathway to Zero grant program. This HERS -9 home was completed on June 17, 2015.
Quick Facts
General
Location | Northampton, Massachusetts |
---|---|
Building Type | Singe family residence |
Project Type | Zero Energy |
Basis of Performance Claim | Modeled |
Bedrooms | 4 |
Bathrooms | 2.5 |
Conditioned Floor Area | 2,234 sq ft |
Total Cost of Project | $407,900 |
Energy Summary
Energy Data Type | Modeled |
---|---|
Renewable Energy System Type(s) | |
Ratings | |
HERS Index | -9 |
Envelope and Mechanicals
Subslab assembly |
2" of rigid under the basement slab. |
---|---|
Foundation wall assembly |
3.5" of high density foam. |
Above grade wall assembly |
12" of double studded wall mostly filled with medium density foam. |
Air Changes per hour, ACH50 | 1.00 ACH50 |