PERSIST/REMOTE technique. Liquid applied barriers when possible to prevent peel-back and other issues with pressure applied air barriers. Super Insulation, multi-layer, offset seams throughout project.

Subslab assembly

Two layers of 2.75" EPS, offset overlaps. Stego vapor barrier, mastic, tape sealed.

Subslab R-value 22.0
Slab edge assembly

Nudura ICF, with additional layer of 2.75" EPS to interior and overlap of sub slab EPS, to prevent thermal bridging.

Slab edge R-value 37.0
Foundation wall assembly

Waterproofing membrane, ICF Nudura block, with additional 2.75" EPS to interior. 2x4, and drywall to interior.

Foundation wall R-value 37.0
Above grade wall assembly

Siding, 1/2" minimum rainscreen strapping, one layer of 3.25" EPS, two layers of 2.75" EPS, seams offset, sealed, taped, liquid applied air barrier, OSB, blown-in cellulose, drywall

Above grade wall R-value 54.0
Cathedral ceiling assembly

standing seam, 5/8" plywood, cold roof vent, supplemental rafter/cold roof, 6 layers of 2.75 EPS, Vapor barrier, 1/2" OSB, barnboard strip sheathing (exposed to interior), exposed rafters.

Cathedral ceiling R-value 70.0
Roof Assembly

standing seam, 5/8" plywood, cold roof vent, supplemental rafter/cold roof, 6 layers of 2.75 EPS, Vapor barrier, 1/2" OSB, barnboard strip sheathing (exposed to interior), exposed rafters.

Roof R-value 70.0

Windows and Doors

Window Assembly:

Marvin Next Generation Triple Pane

Door Assembly:

Therma Tru

Average window U-factor 0.23
Solar Heat Gain Coefficient 0.22

Mechanical Systems

Space heating - Manufacturer & Model Mitsubishi Mini Splits
Domestic hot water - Manufacturer & Model A.O. Smith HPWH - 3.10EF
Domestic hot water - capacity 80 gal
Ventilation - Manufacturer & Model Zehnder Comfofond 550
Lighting Manufacturer and Model LED - unknown
Lighting Efficiency
Mechanical Equipment Installation Details and Comments

blower door to be done.

Envelope

Air Changes per hour, ACH50 1.00 ACH50
Air Changes per hour, CFM50