R-60 SIP Roof, R-40 double stud open cell spray foam walls, R-20 closed cell spray foam under slab and covering entire surface of interior of concrete basement walls. R-40 open cell spray foam in rim joist. Triple glazed R-5 windows and doors.

Subslab assembly

R20 closed cell spray foam sprayed on top of 3/4 stone under concrete basement floor slab.

Subslab R-value 20.0
Slab edge assembly

before the slab is poured the closed cell spray foam is sprayed on the stone and up the interior of the foundation walls. Therefore the slab is completely insulated from the outside.

Slab edge R-value 20.0
Foundation wall assembly

closed cell foam sprayed to R20 on inside of foundation walls

Foundation wall R-value 20.0
Above grade wall assembly

12" double stud walls filled with open cell spray foam insulation.

Above grade wall R-value 40.0
Flat attic assembly

No flat attic. Cathedral SIP roof

Cathedral ceiling assembly

16" thick EPS SIP Panel Roof

Cathedral ceiling R-value 60.0
Roof Assembly

16" thick EPS SIP Panel Roof

Roof R-value 60.0

Windows and Doors

Window Assembly:

vinyl new construction triple glazed, low-e, krypton gas filled double hung windows from Harvey Tribute Line

Door Assembly:

Sliding glass door is from same Harvey Tribute line with same spec's as windows. Entry doors are Therma-Tru Classic Craft models

Average window U-factor 0.20
Solar Heat Gain Coefficient 0.22
Visible Light Transmittance 0.32
Door U-Factor 0.20
Door Area 80 sq ft

Mechanical Systems

Space cooling - Manufacturer & Model Fujitsu XLTH
Space cooling - capacity 24 kW
Space heating - Manufacturer & Model Fujitsu XLTH
Space heating - capacity 32 kW
Domestic hot water - Manufacturer & Model GE Geospring Heat Pump Hot water Heater
Domestic hot water - capacity 60 gal
Domestic hot water - efficiency 225 kW
Ventilation - Manufacturer & Model Panasonic FV 05 11VKSL1
Lighting Manufacturer and Model LED screw in
Lighting Efficiency LED
Mechanical Equipment Installation Details and Comments

blower door testing will be done at end of construction. All ducting is within the conditioned space.

Envelope

Air Changes per hour, ACH50 1.00 ACH50